A deck is mostly a structure you do not see: footings, posts, beams, joists, flashing at the house, and the ledger board that ties it to the building. The visible boards and railing are the smaller part of both cost and risk. Most deck failures start at the ledger or the footings, so that is where to ask questions.
Pressure-treated lumber is the lowest-cost option and needs regular sealing. Cedar looks better and costs more. Composite and PVC boards cost the most up front and ask the least of you afterward. In Zonda's 2025 Cost vs. Value report, a wood deck addition averaged $18,263 and a composite deck $25,096.
Check the property's permit jurisdiction
For a Baltimore City property, the City says replacing or significantly altering a structure requires a permit, with exceptions for some minor repairs, and all permits require inspections. Its construction-permit page links a deck-and-balcony construction-details example. For a County property, check County guidance rather than applying the City's process. Ask the bidder who will confirm requirements, prepare drawings and handle the application. Fees depend on the work; this guide assigns no standard fee or inspection schedule.

What it costs
| Item | Range | Source |
|---|---|---|
| Labor to build a deck | $11 to $22 per sq ft | HomeGuide 2026 |
| Pressure-treated decking boards | $2 to $7 per sq ft | Krueger Brothers 2022 |
| Cedar decking boards | $4 to $8 per sq ft | Krueger Brothers 2022 |
| Composite decking boards | $8 to $15 per sq ft | Krueger Brothers 2022 |
| Wood deck addition, national average job | $18,263 | Cost vs. Value 2025 |
| Composite deck addition, national average job | $25,096 | Cost vs. Value 2025 |
Deck pricing is the most scattered of the six services here, and the best public data is a mix of years and sources, so treat this as a map and not a quote. Board prices rise over time, and footings, railing, and stairs are priced separately in many bids.
Compare the whole job, not just the square footage
A price per square foot means little until you know what it includes. New footings, framing, stairs and railing are a different scope from replacing boards. For a board-only bid, ask the contractor to assess the existing structure; Decks.com says to check that the framing is sound and the joists are not rotted.
Give each bidder the same footprint and a sketch showing doors, grade changes, stairs and any existing deck. Ask for a written scope. Once the bids cover the same work, divide each complete bid by the proposed deck surface area. Label that result total installed bid per square foot. If one bid leaves out demolition, stairs or permits, get the missing scope priced before comparing that number with another bid.
What moves the price
- Size and height
- Square footage and distance above grade drive framing and railing cost.
- Board material
- Pressure-treated, cedar, composite, or PVC.
- Railing and stairs
- Often a large separate line item.
- Footings and site
- Frost depth, soil, slope, and access change labor.
- Permit and inspection
- Required in most places for attached decks.
Signs it is time
- Boards that are cupped, splintering, or soft
- A ledger board pulling away from the house or showing rust at the fasteners
- Wobbly railing or posts
- Rust or cracks in joist hangers and post connectors
- Standing water or heavy mildew that sealing no longer fixes
- Footings that heave or settle
Questions to ask a pro
- Is a permit included, and who pulls it?
- How deep are the footings, and what frost depth applies here?
- How is the ledger attached and flashed to the house?
- Which board, railing, and fastener brands, and what warranties come with them?
- What is included for stairs, lighting, and railing?
- How are changes priced if we find rot at the house wall?
A scope checklist for comparing bids
Mark each row included, excluded or unknown for every bid. The list is a comparison tool, not a claim that contractors routinely omit these items.
| Scope item | What the written bid should clarify |
|---|---|
| Existing deck | Reuse, repair or remove? Who handles debris? |
| Footings, posts and framing | What is new, and what is assumed about the site or existing structure? |
| Ledger and flashing | If attached to the house, what work is included at the connection? |
| Deck boards and fasteners | Exact product line, profile and fastening system? |
| Railing and stairs | Which runs and steps are included? |
| Permits and inspections | Who confirms the permit path, applies, pays fees and schedules visits? |
| Finish and cleanup | What is included at handoff? |
| Unforeseen work | How is a change described, priced and approved? |
If the condition of an old frame cannot be confirmed until boards are removed, write unknown. Keep that uncertainty visible instead of treating a board-only price as a complete rebuild price.
Check the selected board's instructions
Trex's joist guide says composite-decking joists should generally be no more than 16 inches on center for standard applications and 12 inches for diagonal installations. That is product-installation guidance, not Baltimore code or a rule for every board. Ask which manufacturer's instructions apply to the exact product in the bid, especially over an older frame.
Common questions
Wood or composite?
If you hate maintenance and plan to stay, composite wins on lifetime cost in many comparisons. If budget matters most now, pressure-treated with regular sealing is the lowest entry price.
Can I replace just the boards?
Often yes, if the framing is sound. Have someone check the joists, ledger, and footings first; new boards on rotten framing is money wasted.
Sources
- HomeGuide, How Much Does It Cost to Build a Deck? (2026)
- Krueger Brothers (Colorado deck builder), Costs to Build a Deck (2022)
- Zonda / JLC Cost vs. Value 2025 (national averages), as summarized by Project Home Wise
- Decks.com, Composite Decking Price Comparison
- Trex, How to Install Deck Joists
- Baltimore City, Building Permits
- Baltimore City, Permit Information for Construction